<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Temporary Works Design Engineer - Parker Jones Group Ltd RSS Feed</title>
    <link>https://jobs.co.uk/job/temporary-works-design-engineer-parker-jones-group-ltd--fc6a180c-6707-452c-956d-56113ea39e34</link>
    <description>RSS feed for Temporary Works Design Engineer at Parker Jones Group Ltd.</description>
    <language>en-gb</language>
    <lastBuildDate>Tue, 13 Oct 2026 19:41:39 GMT</lastBuildDate>
    <item>
      <title>Temporary Works Design Engineer - Parker Jones Group Ltd</title>
      <link>https://jobs.co.uk/job/temporary-works-design-engineer-parker-jones-group-ltd--fc6a180c-6707-452c-956d-56113ea39e34</link>
      <guid>https://jobs.co.uk/job/temporary-works-design-engineer-parker-jones-group-ltd--fc6a180c-6707-452c-956d-56113ea39e34</guid>
      <pubDate>Mon, 12 Oct 2026 23:00:00 GMT</pubDate>
      <description>Location: Redcar | Salary: Negotiable | Type: Permanent | Temporary Works Design Engineer required in Redcar  Construction of the underground network to support the Gas Fired Power station with carbon capture in the North East. Every structure, building road etc will need some type of ducting, pipework, drains to support the facility. Temporary works for the project will include structures, manholes, duct banks, chambers, pits, excavations deep (slope stability / support systems), -access / working platforms, assemble facilities, crane / pump platforms and any temporary works for lifting operations.   The Role   This is a practical, design-focused role for an engineer who enjoys solving the engineering problems that sit between  design and construction .  You will be responsible for developing temporary works solutions for heavy civil engineering projects, taking designs from an initial construction requirement through to detailed design, checking and construction support.  You will work closely with our Design Managers, Project Managers, Site Managers and Site Engineers to understand how the works need to be constructed and then develop temporary works that are safe, practical, buildable and proportionate to the project requirements.  Th...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>