<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Surveyor - Disabled Facilities - ARC Group RSS Feed</title>
    <link>https://jobs.co.uk/job/surveyor-disabled-facilities-arc-group--ce461bbb-9795-4179-b5de-6279ed18dc99</link>
    <description>RSS feed for Surveyor - Disabled Facilities at ARC Group.</description>
    <language>en-gb</language>
    <lastBuildDate>Thu, 25 Jun 2026 05:16:26 GMT</lastBuildDate>
    <item>
      <title>Surveyor - Disabled Facilities - ARC Group</title>
      <link>https://jobs.co.uk/job/surveyor-disabled-facilities-arc-group--ce461bbb-9795-4179-b5de-6279ed18dc99</link>
      <guid>https://jobs.co.uk/job/surveyor-disabled-facilities-arc-group--ce461bbb-9795-4179-b5de-6279ed18dc99</guid>
      <pubDate>Mon, 22 Jun 2026 23:00:00 GMT</pubDate>
      <description>Location: Northampton | Salary: &amp;pound;49000 - &amp;pound;50000/annum | Type: Contract | Job Title: Surveyor - Disabled Facilities  Job Type: 12 Months contract (likely to extend)  Location: North Northamptonshire / Hybrid  Rate of pay: FROM Paye £25.50 / £49,000per annum or Umbrella £35ph     Our client, a highly regarded organisation within the housing and property sector, is seeking an experienced  Disabled Facilities (DFG) Surveyor  to join their team. This is an excellent opportunity for a surveying professional with experience in housing adaptations, private sector housing, or grant-funded improvement works to play a key role in delivering life-changing adaptations that enable residents to live safely and independently in their homes.    Main duties include, but not limited to:   Undertake property surveys and prepare detailed specifications, schedules of work, technical drawings, and cost estimates.   Liaise with Occupational Therapists, architects, engineers, contractors, and other professionals to ensure projects progress efficiently.    Obtain and evaluate contractor quotations and tenders, making recommendations where appropriate.    Carry out final inspections and manage defect resolution during defect liability periods.    Requirements to be successful:   ...</description>
      <category>Contract</category>
    </item>
  </channel>
</rss>