<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Structural &amp;amp; Temporary Works Engineer - JRL Group RSS Feed</title>
    <link>https://jobs.co.uk/job/structural-amp-temporary-works-engineer-jrl-group--c9568800-9e09-4df8-83c6-409bc88aff5c</link>
    <description>RSS feed for Structural &amp;amp; Temporary Works Engineer at JRL Group.</description>
    <language>en-gb</language>
    <lastBuildDate>Thu, 08 Oct 2026 19:53:43 GMT</lastBuildDate>
    <item>
      <title>Structural &amp;amp; Temporary Works Engineer - JRL Group</title>
      <link>https://jobs.co.uk/job/structural-amp-temporary-works-engineer-jrl-group--c9568800-9e09-4df8-83c6-409bc88aff5c</link>
      <guid>https://jobs.co.uk/job/structural-amp-temporary-works-engineer-jrl-group--c9568800-9e09-4df8-83c6-409bc88aff5c</guid>
      <pubDate>Wed, 07 Oct 2026 23:00:00 GMT</pubDate>
      <description>Location: Borehamwood | Salary: Negotiable | Type: Permanent | Structural &amp; Temporary Works Engineer   Location: Borehamwood          Spearheading the JRL Group from the outset J Reddington Ltd have been an industry leading groundwork and concrete (RC) frame specialist for over two decades. Building on a proven track record to date, the company is now increasingly being called upon to deliver solutions on larger projects in London and the South East providing the core to the business.   J Reddington is the Civil and Structural direct delivery construction arm of the JRL group. We have an in house team, capable of the design and build of: piling, deep basements, drainage, civils and structural RC frames. We work both in the external market for key clients and for Midgard on internal self-delivered projects.   Due to continued growth, we are recruiting a Structural &amp; Temporary Works Engineer.        Role &amp; Responsibilities:        • Assist in the development of permanent works civil and structural design from RIBA stage 3/4, through to construction and handover • Support the site delivery teams with assessment of structures in the temporary condition, including temporary works design. • Complete CDP elements such as precast conversion, reinforce...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>