<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Site Manager - Civil Engineering - Port/Dock - Fawkes &amp;amp; Reece London RSS Feed</title>
    <link>https://jobs.co.uk/job/site-manager-civil-engineering-portdock-fawkes-amp-reece-london--9e681221-9b7e-4aba-a452-febbf6df191f</link>
    <description>RSS feed for Site Manager - Civil Engineering - Port/Dock at Fawkes &amp;amp; Reece London.</description>
    <language>en-gb</language>
    <lastBuildDate>Tue, 06 Oct 2026 21:12:44 GMT</lastBuildDate>
    <item>
      <title>Site Manager - Civil Engineering - Port/Dock - Fawkes &amp;amp; Reece London</title>
      <link>https://jobs.co.uk/job/site-manager-civil-engineering-portdock-fawkes-amp-reece-london--9e681221-9b7e-4aba-a452-febbf6df191f</link>
      <guid>https://jobs.co.uk/job/site-manager-civil-engineering-portdock-fawkes-amp-reece-london--9e681221-9b7e-4aba-a452-febbf6df191f</guid>
      <pubDate>Mon, 05 Oct 2026 23:00:00 GMT</pubDate>
      <description>Location: Felixstowe | Salary: &amp;pound;500 - &amp;pound;525/day CIS | Type: Contract | Site Manager - Major Port Infrastructure Project     Site Manager - Major Port Infrastructure Project  -500525 per day CIS  Contract | Major UK Port Infrastructure Project     We are currently seeking an experienced Site Manager to join a major marine and port infrastructure project, delivering a significant programme of works to upgrade and extend the operational life of an existing Berth     This is an excellent opportunity for a Site Manager with a strong background in marine civils, heavy civil engineering, ports, infrastructure or complex works within live operational environments.     The Project  The project involves a range of technically challenging works, including:     Strengthening the existing rear crane beam.     Replacement of front and rear quay crane rails to facilitate the introduction of larger cranes.     Replacement of front crane beam stow pin sockets.     Diversion, protection and reinstatement of existing utilities and drainage.     Excavation, backfilling and reinstatement of pavements.     Replacement of end-of-life fender systems, including the supply and installation of 10 fenders plus 5 spares, complete with panels, chains, ladders and associated fixing...</description>
      <category>Contract</category>
    </item>
  </channel>
</rss>