<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Rail Systems Engineer - FERROVIAL CONSTRUCTION (UK) LIMITED RSS Feed</title>
    <link>https://jobs.co.uk/job/rail-systems-engineer-ferrovial-construction-uk-limited--7b8e8e11-0108-4d63-8b5f-1d383dfaaa94</link>
    <description>RSS feed for Rail Systems Engineer at FERROVIAL CONSTRUCTION (UK) LIMITED.</description>
    <language>en-gb</language>
    <lastBuildDate>Sat, 26 Sep 2026 16:49:09 GMT</lastBuildDate>
    <item>
      <title>Rail Systems Engineer - FERROVIAL CONSTRUCTION (UK) LIMITED</title>
      <link>https://jobs.co.uk/job/rail-systems-engineer-ferrovial-construction-uk-limited--7b8e8e11-0108-4d63-8b5f-1d383dfaaa94</link>
      <guid>https://jobs.co.uk/job/rail-systems-engineer-ferrovial-construction-uk-limited--7b8e8e11-0108-4d63-8b5f-1d383dfaaa94</guid>
      <pubDate>Sat, 26 Sep 2026 11:53:54 GMT</pubDate>
      <description>Location: Euston | Salary: 10000-500000 Annual | Type: Permanent | Rail Systems Engineer We are now recruiting for a Rail Systems Engineer to join the HS2 Track infrastructure project at the initial design phase which will run concurrently with the completion of main works contracts, which are now at their peak. The team operate under a collaborative Rail Systems Alliance structure, designed to manage interfaces and resolve any program conflicts. The members will work together on design, access, resources, and logistics to achieve shared goals for cost and schedule. Department: Engineering/Design Reports to: Technical Assurance Lead Location: open to Euston, London or Birmingham Key responsibilities Managing technical risks and assumptions is essential for controlling and allocating project risk. Quantifying potential impacts supports accurate, informed decisions on the appropriate response. The Rail Systems Engineer ensures that Technical Risk and Assumption Management processes are fully followed, with all outputs recorded in an auditable and accountable manner.  Administers the Technical Risk and Assumptions Management processes under the guidance of the Rail Systems Design Integration Lead, including arranging review meetings, coordinating att...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>