<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Project Manager - HV Systems - TRIbuild Solutions Limited RSS Feed</title>
    <link>https://jobs.co.uk/job/project-manager-hv-systems-tribuild-solutions-limited--9c0025bb-6844-4bc0-8d63-fec111cb997a</link>
    <description>RSS feed for Project Manager - HV Systems at TRIbuild Solutions Limited.</description>
    <language>en-gb</language>
    <lastBuildDate>Fri, 10 Jul 2026 18:10:35 GMT</lastBuildDate>
    <item>
      <title>Project Manager - HV Systems - TRIbuild Solutions Limited</title>
      <link>https://jobs.co.uk/job/project-manager-hv-systems-tribuild-solutions-limited--9c0025bb-6844-4bc0-8d63-fec111cb997a</link>
      <guid>https://jobs.co.uk/job/project-manager-hv-systems-tribuild-solutions-limited--9c0025bb-6844-4bc0-8d63-fec111cb997a</guid>
      <pubDate>Thu, 09 Jul 2026 23:00:00 GMT</pubDate>
      <description>Location: Porthmadog | Salary: &amp;pound;70000 - &amp;pound;80000/annum  - negotiable | Type: Permanent | Project Manager - HV Systems | Snowdonia National Park    -70,000 - -80,000 (Negotiable, DOE) + Package | Permanent    Location:  Snowdonia National Park (Eryri), North Wales   About the Role   TRIbuild Solutions are recruiting for an experienced Project Manager to join a major infrastructure scheme delivered on behalf of National Grid, based within the stunning Eryri National Park.  The project involves constructing a new cable tunnel beneath the estuary near Portmeirion, enabling the removal of 10 pylons and 3.4km of overhead line, and replacing them with 400kV cables routed through a tunnel deep underground - significantly enhancing the visual and environmental quality of this iconic landscape.  You will play a key role in delivering this landmark engineering project, from design through to construction and commissioning.   The Project Scope Includes:    A 3.4km tunnel, 3.5m in diameter, connecting two new shafts at Garth and Cilfor  Construction of two new headhouses, one at each shaft  A new sealing end compound, plus reconfiguration and extension of an existing sealing end compound  Installation of two high voltage (HV) electrical circuits  Circuit connections between the rec...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>