<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Production Planner - Marshall Land Systems RSS Feed</title>
    <link>https://jobs.co.uk/job/production-planner-marshall-land-systems--c8e29928-839c-4173-a4d8-fe73ded6f181</link>
    <description>RSS feed for Production Planner at Marshall Land Systems.</description>
    <language>en-gb</language>
    <lastBuildDate>Thu, 27 Aug 2026 08:08:00 GMT</lastBuildDate>
    <item>
      <title>Production Planner - Marshall Land Systems</title>
      <link>https://jobs.co.uk/job/production-planner-marshall-land-systems--c8e29928-839c-4173-a4d8-fe73ded6f181</link>
      <guid>https://jobs.co.uk/job/production-planner-marshall-land-systems--c8e29928-839c-4173-a4d8-fe73ded6f181</guid>
      <pubDate>Wed, 26 Aug 2026 11:53:52 GMT</pubDate>
      <description>Location: Mid Glamorgan | Salary: 30000.00-30000.00 Annual | Type: Permanent | Why join Marshall Land Systems in this role:   The Production Planner is responsible for delivering effective capacity and material planning to support operational performance. Working as part of a small team, this role ensures ERP/MRP  systems are optimised to enable efficient production flow, accurate data management, and successful project delivery.   Your responsibilities in this role include:    Develop and manage capacity planning activities in collaboration with the Production Scheduler, ensuring optimal utilisation of resources and alignment with maintenance cycles Plan and manage material demand and stock control through the ERP/MRP system in line with customer requirements Ensure capacity planning is fully integrated within ERP/MRP systems to optimise delivery performance, efficiency, and cost Manage and maintain data accuracy within the ERP system (IFS), including actioning MRP messages and resolving stock-related queries Load projects into the system following design release, including Master Part setup and validation of key data fields Release projects to planning, purchasing, and production in a timely manner Process amendments within the MRP system, ensuring parts ar...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>