<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>MV/HV Project Engineer - CRG TEC RSS Feed</title>
    <link>https://jobs.co.uk/job/mvhv-project-engineer-crg-tec--30944191-6887-41db-bef7-d99423e6d11f</link>
    <description>RSS feed for MV/HV Project Engineer at CRG TEC.</description>
    <language>en-gb</language>
    <lastBuildDate>Mon, 15 Jun 2026 09:34:17 GMT</lastBuildDate>
    <item>
      <title>MV/HV Project Engineer - CRG TEC</title>
      <link>https://jobs.co.uk/job/mvhv-project-engineer-crg-tec--30944191-6887-41db-bef7-d99423e6d11f</link>
      <guid>https://jobs.co.uk/job/mvhv-project-engineer-crg-tec--30944191-6887-41db-bef7-d99423e6d11f</guid>
      <pubDate>Tue, 02 Jun 2026 23:00:00 GMT</pubDate>
      <description>Location: Leeds | Salary: &amp;pound;40000/annum | Type: Permanent | MV/HV Project Engineer    £50k- base + bonus    Permanent position    Yorkshire    Hybrid working      As Technical Project Engineer, you’ll manage engineering design &amp; project execution across low to medium-complexity MV projects.  You’ll produce &amp; review engineering drawings, prepare manufacturing documentation, support FATs, manage project activity, monitor progress &amp; ensure projects are delivered to budget, quality &amp; schedule.  You’ll also work closely with project deployment teams, manufacturing teams &amp; internal stakeholders to ensure smooth delivery from design through to final handover.      What you’ll be doing:      • Managing medium-voltage equipment projects from design through to delivery  • Producing &amp; reviewing engineering drawings, BOMs &amp; technical documentation  • Supporting Factory Acceptance Tests with clients  • Working with protection schemes, control circuits &amp; MV electrical systems  • Coordinating project activity across internal teams  • Monitoring progress against budget, quality &amp; schedule  • Identifying technical risks &amp; supporting mitigation plans  • Providing technical support during design, manufacturing &amp; testing phases      What we’re looking for:    ...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>