<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>MEP Lead &amp;ndash; Data Centre Construction - Sustainable Infrastructure RSS Feed</title>
    <link>https://jobs.co.uk/job/mep-lead-ndash-data-centre-construction-sustainable-infrastructure--8ef86ec9-d988-4828-b431-5c6a815cd599</link>
    <description>RSS feed for MEP Lead &amp;ndash; Data Centre Construction at Sustainable Infrastructure.</description>
    <language>en-gb</language>
    <lastBuildDate>Tue, 13 Oct 2026 18:12:14 GMT</lastBuildDate>
    <item>
      <title>MEP Lead &amp;ndash; Data Centre Construction - Sustainable Infrastructure</title>
      <link>https://jobs.co.uk/job/mep-lead-ndash-data-centre-construction-sustainable-infrastructure--8ef86ec9-d988-4828-b431-5c6a815cd599</link>
      <guid>https://jobs.co.uk/job/mep-lead-ndash-data-centre-construction-sustainable-infrastructure--8ef86ec9-d988-4828-b431-5c6a815cd599</guid>
      <pubDate>Mon, 12 Oct 2026 23:00:00 GMT</pubDate>
      <description>Location: Manchester | Salary: &amp;pound;120000/annum | Type: Permanent | MEP Lead – Data Centre Construction    Location:  Blyth  Sector:  Data Centres / Mission-Critical Infrastructure  Employment Type:  Full-time  Working Pattern:  Site-based, with a 10/4 rotation available  Salary:  Circa £120,000 / €140,000   About the Role   We are seeking an experienced  MEP Lead  to join a major data centre construction project in the UK.  This is a senior site-based leadership position responsible for overseeing the delivery of mechanical and electrical works, managing engineering and construction teams, and ensuring that all MEP activities are coordinated and delivered safely, efficiently and to the required quality standards.  The successful candidate will work closely with the Contracts Manager, Site Engineers, discipline leads and specialist subcontractors to drive programme performance, resolve technical issues and coordinate installation through to commissioning.  This opportunity would suit an experienced MEP professional with a strong background in large-scale construction projects, excellent leadership skills and the ability to manage complex mechanical and electrical packages within a demanding project environment.   Key Responsibilities   	 Lead and m...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>