<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>HGV Class 2 Concrete Pump Driver - Meriden Media RSS Feed</title>
    <link>https://jobs.co.uk/job/hgv-class-2-concrete-pump-driver-meriden-media--c84e6de8-1ff8-4031-aa91-d4a773181c5a</link>
    <description>RSS feed for HGV Class 2 Concrete Pump Driver at Meriden Media.</description>
    <language>en-gb</language>
    <lastBuildDate>Sat, 27 Jun 2026 20:14:33 GMT</lastBuildDate>
    <item>
      <title>HGV Class 2 Concrete Pump Driver - Meriden Media</title>
      <link>https://jobs.co.uk/job/hgv-class-2-concrete-pump-driver-meriden-media--c84e6de8-1ff8-4031-aa91-d4a773181c5a</link>
      <guid>https://jobs.co.uk/job/hgv-class-2-concrete-pump-driver-meriden-media--c84e6de8-1ff8-4031-aa91-d4a773181c5a</guid>
      <pubDate>Sat, 27 Jun 2026 11:52:06 GMT</pubDate>
      <description>Location: Glastonbury | Salary: 37000.00-37000.00 Annual | Type: Permanent | HGV Class 2 Concrete Pump Driver / Plant OperativeLocation: GlastonburySalary: £37,000 per annumHours: Typically 07:00 - 16:00 (flexibility required)Full Time PermanentWe are currently recruiting for a HGV Class 2 Concrete Pump Driver / Plant Operative to join a well-established and growing business in the construction materials sector.This is an excellent opportunity for an experienced concrete pump operator or a newly qualified Class 2 driver looking to develop a long-term career within the industry. Full training can be provided for the right candidate.Newly qualified Class 2 drivers are encouraged to apply. Previous construction or site experience is desirable, although full training will be provided.The successful applicant will be responsible for operating and maintaining a concrete line pump, delivering excellent customer service on-site, and supporting the day-to-day operations of a ready-mix concrete batching plant when the pump is not scheduled for work.Key ResponsibilitiesConcrete Pump OperationsSafely operate the concrete line pump in accordance with company procedures and site requirements.Set up, assemble and dismantle pipelines, hoses and pumping systems on-site.Accu...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>