<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Drainage Gang - Randstad Construction and Property RSS Feed</title>
    <link>https://jobs.co.uk/job/drainage-gang-randstad-construction-and-property--2d0e6bc4-ddb2-4a4f-9003-f400419f0a18</link>
    <description>RSS feed for Drainage Gang at Randstad Construction and Property.</description>
    <language>en-gb</language>
    <lastBuildDate>Thu, 11 Jun 2026 03:40:11 GMT</lastBuildDate>
    <item>
      <title>Drainage Gang - Randstad Construction and Property</title>
      <link>https://jobs.co.uk/job/drainage-gang-randstad-construction-and-property--2d0e6bc4-ddb2-4a4f-9003-f400419f0a18</link>
      <guid>https://jobs.co.uk/job/drainage-gang-randstad-construction-and-property--2d0e6bc4-ddb2-4a4f-9003-f400419f0a18</guid>
      <pubDate>Thu, 21 May 2026 23:00:00 GMT</pubDate>
      <description>Location: Blyth | Salary: &amp;pound;20 - &amp;pound;23/hour | Type: Temporary | Drainage Gang Needed: Major Infrastructure Project (Blyth)    Location:  Blyth, Northumberland (NE22 Area)   Rate:   Up to -23.00 per hour (CIS)     Start Date:  June 2026   Duration:  Ongoing (Long-term, multi-phase civil project)   Hours:  Standard 45 hours per week (Monday - Friday)   The Opportunity:   We are looking for an established, highly experienced  Drainage Gang  (2-man or 3-man configuration) to join a flagship infrastructure development in  Blyth  starting on  Monday 1st June .  This is a premium, long-term opportunity on a high-profile Tier 1 site. We are specifically looking for a proven team of specialist pipelayers and machine operators who can hit the ground running with deep drainage packages and work safely to high engineering tolerances.   (3-Man): 1 x 360 Operator (with Lifting Ops) + 2 x Skilled Groundworkers/Pipe Layers.    Key Responsibilities:      Deep Drainage Installation:  Precision installation of large-bore concrete, clay, and twin-wall pipe systems (S104/adoptable sewers).     Trench Safety &amp; Management:  Safely executing excavations using trench boxes, manhole shutters, and complex shoring systems.     Laser &amp; Level Control:  Setting out and layin...</description>
      <category>Temporary</category>
    </item>
  </channel>
</rss>