<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Document controller - Salter Grange Limited RSS Feed</title>
    <link>https://jobs.co.uk/job/document-controller-salter-grange-limited--16185f8a-4996-4da2-a65a-546b52bdadc3</link>
    <description>RSS feed for Document controller at Salter Grange Limited.</description>
    <language>en-gb</language>
    <lastBuildDate>Sun, 18 Oct 2026 03:48:34 GMT</lastBuildDate>
    <item>
      <title>Document controller - Salter Grange Limited</title>
      <link>https://jobs.co.uk/job/document-controller-salter-grange-limited--16185f8a-4996-4da2-a65a-546b52bdadc3</link>
      <guid>https://jobs.co.uk/job/document-controller-salter-grange-limited--16185f8a-4996-4da2-a65a-546b52bdadc3</guid>
      <pubDate>Sat, 17 Oct 2026 11:53:04 GMT</pubDate>
      <description>Location: City | Salary: 45000.00-45000.00 Annual | Type: Permanent | Document Controller - City of London   Working Arrangement: Office-based with occasional site visits We are working with a well-established and highly regarded main contractor with an impressive portfolio of high-quality construction projects across London. With a strong reputation for delivering complex, high-specification schemes, the business offers a professional, collaborative working environment and excellent opportunities for long-term career development. Due to continued growth, they are looking to appoint an experienced Document Controller to join their team at their Central London office, with occasional visits to project sites.  Key Responsibilities:  Manage and maintain project documentation, drawings and registers using Procore. Ensure all project information is accurately recorded, distributed and kept up to date. Coordinate drawing submissions, revisions and approvals. Manage design RFIs, change control processes and associated trackers. Liaise with Design Managers, project teams, consultants and clients. Prepare design review documentation, reports and meeting minutes. Support site teams with Procore and document management procedures.  Requirements:  Previous Docum...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>