<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Document Controller - Buildforce Solutions Ltd RSS Feed</title>
    <link>https://jobs.co.uk/job/document-controller-buildforce-solutions-ltd--8ec88c4d-d382-4be7-98b5-74abd297eae7</link>
    <description>RSS feed for Document Controller at Buildforce Solutions Ltd.</description>
    <language>en-gb</language>
    <lastBuildDate>Tue, 09 Jun 2026 18:53:22 GMT</lastBuildDate>
    <item>
      <title>Document Controller - Buildforce Solutions Ltd</title>
      <link>https://jobs.co.uk/job/document-controller-buildforce-solutions-ltd--8ec88c4d-d382-4be7-98b5-74abd297eae7</link>
      <guid>https://jobs.co.uk/job/document-controller-buildforce-solutions-ltd--8ec88c4d-d382-4be7-98b5-74abd297eae7</guid>
      <pubDate>Thu, 04 Jun 2026 23:00:00 GMT</pubDate>
      <description>Location: Wolverhampton | Salary: &amp;pound;18 - &amp;pound;24/hour | Type: Temporary | Document Controller - Education Project   Location:  Wolverhampton (4 days on site, 1 day working from home)  Rate:  -18.00 - -24.00 per hour (DOE)  Contract Length:  Up to 3 Years  Sector:  Construction / Education  Software:  BIM 360 / Autodesk Construction Cloud (ACC)  We are currently recruiting for an experienced  Document Controller  to join a leading Main Contractor delivering a major education project in Wolverhampton.  This is an excellent opportunity to secure a long-term contract of up to 3 years on a high-profile project, offering flexible working arrangements with 4 days on site and 1 day working from home.  The Role  As Document Controller, you will play a key role in managing project documentation, ensuring all drawings, technical information and project records are accurately controlled and distributed across the project team.  Key Responsibilities    Managing and maintaining project documentation using BIM 360 and/or Autodesk Construction Cloud (ACC).   Uploading, distributing and tracking drawings, specifications and technical documents.   Ensuring document control procedures are followed by all project stakeholders.   Maintaining accurate document registers and r...</description>
      <category>Temporary</category>
    </item>
  </channel>
</rss>