<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Document Author - Rullion Managed Services RSS Feed</title>
    <link>https://jobs.co.uk/job/document-author-rullion-managed-services--1d2476bb-a1a7-4ac1-9286-dfa2d2c9c630</link>
    <description>RSS feed for Document Author at Rullion Managed Services.</description>
    <language>en-gb</language>
    <lastBuildDate>Fri, 23 Oct 2026 08:45:20 GMT</lastBuildDate>
    <item>
      <title>Document Author - Rullion Managed Services</title>
      <link>https://jobs.co.uk/job/document-author-rullion-managed-services--1d2476bb-a1a7-4ac1-9286-dfa2d2c9c630</link>
      <guid>https://jobs.co.uk/job/document-author-rullion-managed-services--1d2476bb-a1a7-4ac1-9286-dfa2d2c9c630</guid>
      <pubDate>Wed, 07 Oct 2026 11:53:16 GMT</pubDate>
      <description>Location: Somerset | Salary: 138.00-138.00 Daily | Type: Contract | Role: Document AuthorPosition: ContractLocation: Hinkley Point C/ SDC/ Cannington/ Aztec WestDays on Site: 3Duration: Approx until 31st Dec 2027Pay:  138 PAYE - 187 UmbrellaJob PurposeSupport the Pre-Operations team in the development of the Operational Documentation required for an Operational HPC. The Document Author shall be responsible for assisting in the production of operational documentation, through all stages of the document''s lifecycle.Operating Environment HPC is one of four EPR Technology Power Stations and has close links to EDF''s Energy''s existing nuclear business. As part of the development of the HPC Strategy it is important that we embedded the lessons learned from the other EPR Technology Power Stations and EDF''s Energy''s existing nuclear business.The role is based within the Operational Capability programme, part of Pre-Operations function, which is a part of the HPC project.The role of the Pre-Operations function is to ensure that the future operating organisation, including people, working arrangements, equipment, facilities and documents are ready for when Hinkley Point C starts generating electricity.The Pre-Operations function is split into four differ...</description>
      <category>Contract</category>
    </item>
  </channel>
</rss>