<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Design Manager - Data Centre Construction - 3D Personnel LTD RSS Feed</title>
    <link>https://jobs.co.uk/job/design-manager-data-centre-construction-3d-personnel-ltd--f40dad24-980d-4093-9169-988b90f775ee</link>
    <description>RSS feed for Design Manager - Data Centre Construction at 3D Personnel LTD.</description>
    <language>en-gb</language>
    <lastBuildDate>Fri, 16 Oct 2026 22:23:20 GMT</lastBuildDate>
    <item>
      <title>Design Manager - Data Centre Construction - 3D Personnel LTD</title>
      <link>https://jobs.co.uk/job/design-manager-data-centre-construction-3d-personnel-ltd--f40dad24-980d-4093-9169-988b90f775ee</link>
      <guid>https://jobs.co.uk/job/design-manager-data-centre-construction-3d-personnel-ltd--f40dad24-980d-4093-9169-988b90f775ee</guid>
      <pubDate>Fri, 16 Oct 2026 11:54:17 GMT</pubDate>
      <description>Location: Blyth | Salary: 80000.00-80000.00 Annual | Type: Permanent | Design Manager - Data Centre ConstructionLocation: Blyth, Northumberland3D Personnel are recruiting on behalf of an established international main contractor delivering major data centre and mission-critical construction projects across the UK and Europe.Our client is seeking an experienced Design Manager to oversee the coordinated delivery of CSA and MEP design packages on a major data centre development in Blyth.The RoleManage the in-house design team and external engineering and architectural consultantsCoordinate CSA and MEP design packages throughout the construction programmeOversee technical submittals, RFIs, IFC drawing releases and design deliverablesMaintain the design risk register and ensure compliance with Safety in Design requirementsCoordinate OFCI vendor information and integration into the wider designSupport LEED requirements and sustainability-related design obligationsLiaise with temporary works teams and construction managers to resolve design interfacesManage design coordination meetings and ensure technical issues are resolved to programmeCandidate Requirements8+ years'' experience managing design delivery on major construction projectsDegree in Engineering, ...</description>
      <category>Permanent</category>
    </item>
  </channel>
</rss>