<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Design Coordinator - Randstad Construction &amp; Property RSS Feed</title>
    <link>https://jobs.co.uk/job/design-coordinator-randstad-construction-property--e9a61cc6-e46b-4ea6-8375-3c8ac600e3b8</link>
    <description>RSS feed for Design Coordinator at Randstad Construction &amp; Property.</description>
    <language>en-gb</language>
    <lastBuildDate>Sat, 15 Aug 2026 22:41:44 GMT</lastBuildDate>
    <item>
      <title>Design Coordinator - Randstad Construction &amp; Property</title>
      <link>https://jobs.co.uk/job/design-coordinator-randstad-construction-property--e9a61cc6-e46b-4ea6-8375-3c8ac600e3b8</link>
      <guid>https://jobs.co.uk/job/design-coordinator-randstad-construction-property--e9a61cc6-e46b-4ea6-8375-3c8ac600e3b8</guid>
      <pubDate>Sat, 15 Aug 2026 11:52:18 GMT</pubDate>
      <description>Location: Keighley | Salary: 450.00-450.00 Daily | Type: Contract | We are looking for an experienced Design Coordinator to lead the initial stage of design coordination on a footbridge infrastructure project. This is a key pre-construction and Early Contractor Involvement (ECI) role. You will bridge the gap between design engineering, site methodology, and commercial pricing-shaping the construction strategy, managing technical risks, and coordinating multi-disciplinary teams to prepare a robust programme and price for the second phase of delivery.If you have a strong background in civil engineering, bridge construction, heavy lifting, and traffic management coordination, this role offers an exceptional opportunity to drive value engineering on a high-profile regional infrastructure project.Key ResponsibilitiesDesign and ECI Coordination: Lead the first stage of design coordination, ensuring constructability, buildability, and value engineering principles are integrated early.Risk and Value Management: Facilitate and maintain the project Risk and Value Engineering Registers, identifying technical constraints and cost-saving opportunities.Construction Methodology and Planning: Support the development of robust construction sequences, piling methodo...</description>
      <category>Contract</category>
    </item>
  </channel>
</rss>