<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Construction Manager - Michael Taylor Search &amp;amp; Selection RSS Feed</title>
    <link>https://jobs.co.uk/job/construction-manager-michael-taylor-search-amp-selection--d3dd4426-017b-4501-a296-c25a3b0b72ac</link>
    <description>RSS feed for Construction Manager at Michael Taylor Search &amp;amp; Selection.</description>
    <language>en-gb</language>
    <lastBuildDate>Tue, 18 Aug 2026 20:18:44 GMT</lastBuildDate>
    <item>
      <title>Construction Manager - Michael Taylor Search &amp;amp; Selection</title>
      <link>https://jobs.co.uk/job/construction-manager-michael-taylor-search-amp-selection--d3dd4426-017b-4501-a296-c25a3b0b72ac</link>
      <guid>https://jobs.co.uk/job/construction-manager-michael-taylor-search-amp-selection--d3dd4426-017b-4501-a296-c25a3b0b72ac</guid>
      <pubDate>Mon, 17 Aug 2026 23:00:00 GMT</pubDate>
      <description>Location: London | Salary: &amp;pound;300 - &amp;pound;330/day | Type: Temporary | Construction Manager | £20m Commercial Fit-Out, City of London    Day rate:  £300–£325 (DOE) - CIS or Ltd (TBC)   Contract:  16 months   Project value:  c. £20m +   Location:  City of London (Farringdon)  An experienced freelance Construction Manager is required to work as part of a team, reporting to a PM, on a high-profile £20m commercial fit-out and refurbishment in Central London, delivered by a respected contractor specialising in high-end commercial interiors and structural reconfiguration.   The Project   A prominent corner office building is being transformed through a complete refurbishment and extension of the existing structure, creating a superior grade office environment while retaining the existing primary structure.   Scope includes:   	 Full Cat A &amp; Cat B fit-out 	 Cut &amp; carve works, including structural removals, floor additions and basement alterations 	 Removal of the existing low-quality façades and top-floor roof level 	 New high-quality stone and brick façade 	 New two-storey extension 	 Improved thermal envelope and urban greening to terraces 	 New end-of-trip cycle facilities 	 High-spec finishes throughout 	 Logistically challenging Central London location ...</description>
      <category>Temporary</category>
    </item>
  </channel>
</rss>