<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Configuration Change Engineer - HYBRID - Morson Edge RSS Feed</title>
    <link>https://jobs.co.uk/job/configuration-change-engineer-hybrid-morson-edge--4fa21ac0-3dd7-44d8-ac4a-5f191bf5603d</link>
    <description>RSS feed for Configuration Change Engineer - HYBRID at Morson Edge.</description>
    <language>en-gb</language>
    <lastBuildDate>Mon, 03 Aug 2026 18:58:53 GMT</lastBuildDate>
    <item>
      <title>Configuration Change Engineer - HYBRID - Morson Edge</title>
      <link>https://jobs.co.uk/job/configuration-change-engineer-hybrid-morson-edge--4fa21ac0-3dd7-44d8-ac4a-5f191bf5603d</link>
      <guid>https://jobs.co.uk/job/configuration-change-engineer-hybrid-morson-edge--4fa21ac0-3dd7-44d8-ac4a-5f191bf5603d</guid>
      <pubDate>Sun, 02 Aug 2026 23:00:00 GMT</pubDate>
      <description>Location: Almondsbury | Salary: Negotiable | Type: Contract | Location: Client offices at Aztec West, Bristol x3 days per week AND x2 days per week remote working.   (Note - there may be an infrequent requirement to visit the Project site in Somerset).    Duration: Approval until end December 2026 (with HIGH probability of renewal)    Status: CONTRACT - INSIDE IR35    Reports to: Configuration Manager   Morson Edge are working with a major player in the Energy sector who have a current contract requirement for a  Configuration Change Engineer  to join their established Project team. All work is associated with a major nuclear energy infrastructure Project in the Southwest. This assignment will be based at our client''s offices at Aztec West in Bristol and is offered on a hybrid basis.    Principal Accountabilities    To support the Change Control Branch of Configuration Assurance in coordinating Project activities within the Configuration Management processes.  This will involve providing technical assistance and managing activities so that the Configuration Management processes owned by Configuration Assurance are properly, adequately and efficiently implemented across the project.    Main Scope:    Along with the rest of the Change Control ...</description>
      <category>Contract</category>
    </item>
  </channel>
</rss>